Describe
Set out the actual premises, people, scope and limitations.
Completed fictional example
See how premises information, observations and evidence can be translated into significant findings and a practical, accountable action plan.
What this page demonstrates
Set out the actual premises, people, scope and limitations.
Connect hazards and occupants to the adequacy of precautions.
Give every material shortcoming an owner and completion route.
Premises and scope
Example House is a converted two-storey commercial building occupied by one professional-services business. The assessment covers the office accommodation, kitchenette, internal stair and final exits.
No opening-up was undertaken. Fire resistance concealed above ceilings was not verified. Maintenance records were sampled, and an unavailable alarm service certificate is recorded as an action rather than assumed satisfactory.
People at risk
Most staff know the building and can use the internal stair independently. The assessment also considers visitors, contractors, lone workers and anyone who may need assistance temporarily or permanently.
Usually familiar with the alarm and two final exits, but refresher records are incomplete.
May not recognise the alarm or routes and depend on their host for information.
No current employee has declared a need, but the visitor process does not reliably identify or communicate one.
Occasional out-of-hours work requires the alarm, access and emergency arrangements to remain effective.
03 · Findings
Each row records an observation, explains the required outcome and assigns an initial priority. A real report would include locations, evidence and photographs where useful.
| Subject | Example observation | Required outcome | Priority |
|---|---|---|---|
| Electrical equipment and extension leads | Portable equipment is used throughout. One workstation has two multiway extension leads connected together. | Remove the daisy-chained arrangement immediately. Provide sufficient fixed sockets or a suitable single distribution arrangement following competent electrical advice. | High |
| Kitchenette and combustible items | Microwave, toaster and kettle are on a non-combustible worktop. Packaging is sometimes stored beside the toaster. | Introduce a marked clear zone around cooking appliances and include it in the closing check. | Medium |
| Rear final exit | The rear exit opens without a key, but two archive boxes narrow the approach route. | Remove the boxes immediately and mark the route as a no-storage area. | High |
| Fire door to kitchenette | The nominal fire-resisting door does not fully close into its frame from every position. | Arrange competent inspection and adjustment; keep the kitchenette use controlled until repaired. | High |
| Fire alarm and testing | A suitable alarm appears present and weekly tests are recorded. The latest service certificate was not available during the visit. | Obtain and verify the current service record; arrange servicing if it cannot be evidenced. | Medium |
| Evacuation assistance | A visitor sign-in system exists, but no written method records or communicates assistance needs. | Introduce a proportionate visitor and employee assistance process and brief relevant staff. | High |
| Emergency lighting records | Emergency lights are installed. Monthly function-test records have not been maintained for the last three months. | Resume and record routine testing; escalate faults and retain competent service evidence. | Medium |
| Fire-safety information | Induction covers the alarm and assembly point. Refresher training is not scheduled or recorded consistently. | Set a risk-based refresher and drill programme, including new starters and changes in duties. | Medium |
Evaluation
The office has established escape routes, an alarm, emergency lighting and basic management arrangements. Several shortcomings reduce confidence that those arrangements will remain effective for every foreseeable occupant.
The escape-route obstruction and unsafe extension-lead arrangement should be corrected immediately. The fire door and assistance arrangements require prompt action. Medium-priority record and management improvements should follow within the stated periods.
This wording does not declare the premises to have “passed” or “failed”. It communicates the assessor’s reasoned conclusion, the limits of available evidence and what the responsible person must manage next.
05 · Action plan
Target dates should reflect risk and practical delivery. Where permanent work cannot be immediate, the responsible person should record and maintain suitable interim controls.
| Ref | Action | Priority | Owner | Target | Status |
|---|---|---|---|---|---|
| A01 | Remove extension-lead daisy chain and provide safe power arrangement | High | Office manager | Immediate | Open |
| A02 | Clear rear escape route and introduce no-storage marking/check | High | Facilities lead | Immediate | Open |
| A03 | Competently inspect and repair kitchenette fire door | High | Building manager | 14 days | Open |
| A04 | Create and brief evacuation-assistance arrangements | High | HR and fire lead | 14 days | Open |
| A05 | Verify current alarm service record or arrange service | Medium | Facilities lead | 30 days | Open |
| A06 | Resume emergency-lighting test records and verify defects | Medium | Facilities lead | 7 days | Open |
| A07 | Set documented refresher training and drill programme | Medium | Office manager | 30 days | Open |
| A08 | Introduce kitchenette clear-zone closing check | Medium | Office manager | 7 days | Open |
Changing “Open” to “Complete” should require suitable evidence, such as a photograph, invoice, service record, revised procedure, training record or responsible-person verification. The action log should retain the completion date and reviewer.
Review
The responsible person sets and records a proportionate planned review programme, but does not wait for that date when a change or new evidence may affect validity.
Use the right starting point
Preview the free template or tell us about premises in London or Surrey to find appropriate assessment support.
Example report FAQs
No. The example demonstrates structure and reasoning only. Your assessment must reflect the actual construction, use, occupants, hazards, precautions, management and evidence at your premises.
Not normally. It evaluates risk and the adequacy of precautions, records findings and identifies actions. A summary rating can help communicate priority but must not replace the underlying evidence and reasoning.
Each action should state the problem and required outcome, its priority, any interim control, who owns it, a target date, status and evidence used to verify completion.
The assessment must now be recorded in full. Significant findings are the material conclusions and measures arising from the assessment, but recording should not be artificially limited to a short list or to premises with five or more employees.
No. Sleeping residential buildings raise different construction, occupancy, evacuation and management questions. Use a premises-specific guide and appoint competence appropriate to the building.
Sources and limitations
Every premises, observation and action on this page is fictional. The example provides general information for England and is not legal advice or a fire risk assessment for any real building.