Assessment support for managed property portfolios

Fire risk assessments for property and managing agents

Practical guidance and enquiry support for property managers, managing agents, block managers and management companies arranging fire risk assessments for one building or a wider London and Surrey portfolio.

Reviewed: 6 August 2026Guidance: EnglandReading time: approximately 8 minutes

Concise answer

Can a property or managing agent be responsible for arranging the FRA?

Yes. A property or managing agent can arrange a fire risk assessment for a landlord, freeholder, management company or other client. Depending on the management agreement and the control exercised in practice, the agent may also be a responsible person or dutyholder for the premises, common parts or fire-safety measures it controls.

The job title does not decide the legal position. The Fire Safety Order looks at employment, ownership and control. Commissioning an assessor does not transfer the client’s or agent’s duties to that assessor, and delegating day-to-day management does not necessarily remove the landlord’s or employer’s responsibilities.

01

Identify the client

Record the legal person instructing the work and who can approve cost, access and additional scope.

02

Map control

Check the lease, management agreement, service contracts and what each party actually controls.

03

Define the premises

State the buildings, common parts, workplaces, plant areas and shared systems within the instruction.

04

Coordinate dutyholders

Exchange relevant information where landlords, employers, tenants or contractors have overlapping duties.

Responsibility map

Start with the management agreement—but verify what happens in practice

A management agreement can allocate responsibility for repairs, maintenance, contractor appointments, inspections, resident communication and fire-safety records. It is important evidence, but legal duties can also arise from the control actually exercised over the premises or a fire-safety measure.

Create a simple responsibility schedule before requesting quotations. The assessor can then understand the intended boundaries and identify interfaces that need cooperation instead of assuming that every action belongs to the same organisation.

Area or measurePossible controlling partyInformation to confirm
Communal corridors and stairsFreeholder, management company or managing agentCleaning, storage, repairs, lighting, doors and final-exit control
Tenant or occupier areasEmployer, commercial tenant or other occupierActivities, staff, local equipment, training and internal escape arrangements
Building-wide fire alarmLandlord, manager or specialist contractorDesign responsibility, testing, faults, interfaces and tenant notification
Fire doors and compartmentationSeveral parties according to location and contractInspection, repair, resident duties, penetrations and completion evidence
Emergency plan and evacuationMultiple responsible personsAlarm response, reception, assembly, vulnerable people and shared drills
Remedial actionsThe party able to authorise and complete each itemNamed owner, priority, due date, access, funding and closure evidence

Different management settings

The assessment scope must fit the building being managed

Property managers may oversee residential common parts, offices, retail units, mixed-use buildings, vacant premises or estates containing several uses. One procurement process can be consistent, but the assessment method, competence and evidence must match each premises.

01

Blocks of flats

Common parts, flat entrance doors, external-wall information, evacuation strategy and resident communication may be relevant.

02

Commercial offices

Tenant activities, common routes, shared alarms, reception, fit-outs and landlord–tenant coordination need clear boundaries.

03

Mixed-use buildings

Residential and commercial risks, warning arrangements, compartmentation and escape interfaces must be considered together.

04

HMOs and rented property

Sleeping risk, licensing, protected routes, detection, access and management arrangements require property-specific evidence.

05

Retail and hospitality

Public occupancy, cooking, late hours, contractors, events and changing layouts may alter complexity and assessor requirements.

06

Vacant or changing premises

Security, utilities, combustible contents, temporary work and future occupation can trigger different control measures and reviews.

Single building or portfolio

Build a consistent programme without treating different buildings as identical

A portfolio approach can make procurement, document naming, access, reporting and action tracking consistent. It cannot replace premises-specific inspection and judgement. Each address should have its own scope, evidence, findings, limitations and action record.

Prioritise buildings using known risk and operational triggers rather than geography alone. A small pilot group can test the brief and report format, but urgent deadlines, sleeping risk, vulnerable occupants, enforcement concerns and significant changes should not wait for the wider programme.

  • Create one property register with address, use, height, storeys, occupancy and management contact
  • Record the landlord, freeholder, management company, employers and known responsible persons
  • Add the existing FRA date, review status, open actions and relevant enforcement or licensing deadlines
  • Flag sleeping accommodation, vulnerable occupants, mixed use, complex construction and engineered strategies
  • Record fire-door, alarm, emergency-lighting, compartmentation and external-wall information separately
  • Prioritise missing or doubtful assessments, material changes, incidents and overdue high-risk actions
  • Agree consistent report naming, delivery, escalation, data handling and action ownership
  • Track every building separately even where one provider assesses several sites

Comparable quotations

Give prospective assessors one clear management and premises brief

A property schedule alone may not show the scope. For the first or most urgent building, explain its use, size, occupancy, construction, shared systems, access and the reason for the assessment. Ask every provider to state assumptions and exclusions against the same information.

For a portfolio, request a pricing structure that preserves premises-specific scope. Confirm whether the proposal includes document review, travel, site attendance, photographs, action planning, quality assurance, factual corrections, follow-up and VAT.

  • Address, postcode, building use, storeys, approximate size and occupancy
  • Areas and systems controlled by the client, manager, tenants and contractors
  • Existing FRA, action plan, fire strategy, plans and relevant handover information
  • Known door, alarm, emergency-lighting, compartmentation or external-wall concerns
  • Reason for the work, report deadline and any original request or authority correspondence
  • Access arrangements for occupied, locked, plant, roof, basement and service areas
  • Required report format, action priorities, limitations and portfolio naming convention
  • Assessor competence, comparable premises experience, insurance and quality assurance

Inspection preparation

Coordinate access, records and the people who know the building

The assessor should not arrive with only a keysafe code and an address. Nominate a contact who understands the building, known defects, occupiers, contractors and recent changes. Tell tenants or residents what access is required and disclose material restrictions before the quotation is finalised.

In a multi-occupied building, relevant responsible persons must cooperate and coordinate. The manager can help by gathering shared-system information, current assessments and emergency arrangements while avoiding unnecessary personal information about residents or employees.

01

Site contact

Provide a person who can explain the building, unlock relevant areas and distinguish fact from assumption.

02

Occupier coordination

Give suitable notice and establish lawful access to areas required by the agreed scope.

03

Contractor records

Gather current test results, defects, impairments, service visits and outstanding quotations.

04

Known limitations

Identify inaccessible areas, missing drawings or uncertain construction before the visit where possible.

After the report

The valuable management work begins when the action plan arrives

A completed report does not close the risk. The manager should allocate every action to the organisation with authority and control, distinguish urgent interim measures from permanent work, and retain evidence that the required outcome was achieved.

Some findings require a separate competent inspection, design or service visit. Keep the assessor’s finding distinct from the contractor’s specification, quotation, completed work and verification. Review the FRA where remedial work, occupancy or other significant information changes its conclusions.

Management recordWhat to captureWhy it matters
Action registerFinding, location, risk priority, owner, deadline and current statusPrevents actions disappearing between reports, emails and contractors
Interim measuresTemporary controls, responsible person, checks and end conditionMakes urgent risk management visible while permanent work is arranged
Completion evidenceCertificates, photographs, reports, invoices and verification where appropriateShows what was actually completed rather than only ordered
Exceptions and accessRefusals, inaccessible areas, cancelled visits and escalationPreserves limitations and supports proportionate follow-up
Review recordChange, incident, new information, decision and assessment updateConnects the live building to the current FRA

Competence and appointment

Match the assessor to the most demanding premises in the instruction

A provider suitable for a small office may not be suitable for a complex residential block, engineered building or mixed-use portfolio. Check the named assessor’s competence and recent comparable experience, not only the company name or headline fee.

BAFE SP205 can provide evidence about an organisation’s life-safety FRA process, while NFRAR records individually assessed fire risk assessors and their displayed competency level. Neither removes the need to check assignment-specific suitability, current status, insurance, scope and limitations.

01

Named assessor

Ask who will inspect, write and validate the report and whether that will change between properties.

02

Comparable work

Match experience to occupancy, construction, height, evacuation strategy and expected complexity.

03

Quality assurance

Understand the organisation’s review process and how material factual or technical issues are handled.

04

Written scope

Confirm areas, sampling, evidence review, exclusions, deliverables, timescale and follow-up before appointment.

Managed-property assessment pathways

Connect each building to the right assessment scope

Use the building-specific guide, verify the assessor and send one concise enquiry for the first property or a wider portfolio programme.

01Blocks of flats02Office assessments03Check competence04Portfolio enquiry

Frequently asked questions

Fire risk assessments for property and managing agents FAQs

Can a managing agent be the responsible person for fire safety?

Yes, depending on the premises, management agreement and control exercised. A managing agent may be a responsible person or dutyholder for matters it controls, while landlords, employers, tenants and others may hold duties at the same time.

Can a property manager arrange a fire risk assessment for a landlord?

Yes. A property manager can request quotations, appoint an assessor with authority, coordinate access and receive the report. The instruction should identify the client, premises, scope, relevant dutyholders and who can authorise additional work.

Can one fire risk assessment cover an entire property portfolio?

No single set of findings can substitute for assessing each premises. A portfolio programme can standardise procurement, reporting and action tracking, but every building needs an appropriate scope, inspection, findings, limitations and review record.

Does a common-parts FRA cover commercial tenants?

Not necessarily. It may address shared routes and building systems but not each tenant’s work activities, people, local hazards or internal arrangements in sufficient depth. The assessment boundaries should be checked and relevant findings coordinated.

What information should a managing agent provide for an FRA quotation?

Provide the address, use, size, storeys, occupancy, controlled areas, shared systems, existing documents, known concerns, reason, deadline and access arrangements. For portfolios, add a property schedule without unnecessary resident personal data.

How should a property manager prioritise several overdue FRAs?

Consider missing or doubtful assessments, sleeping risk, vulnerable people, building complexity, significant changes, incidents, enforcement or licensing deadlines and unresolved high-priority actions. Geography and price should not be the only considerations.

Is the property manager responsible for completing every FRA action?

Not automatically. Each action should be allocated to the party with the relevant authority and control. The manager may coordinate work and records while landlords, tenants, employers, residents or contractors remain responsible for particular matters.

When should the assessment be reviewed?

There is no universal fixed interval. It must be reviewed regularly and when there is reason to suspect it is no longer valid, including after significant changes, incidents, new risk information or material remedial work.

Should a property manager check both BAFE and NFRAR?

They answer different questions. BAFE SP205 concerns an organisation’s certified FRA process, while NFRAR is an individual assessor register. Check both where relevant, then verify comparable experience, current status, insurance and suitability for the assignment.

Can Fire Safety Services help with one building and a portfolio?

Yes. The enquiry form allows a manager to identify one property, several properties or an ongoing programme. The initial form is deliberately short; building schedules, documents and detailed access questions can be discussed securely afterwards.

London and Surrey portfolio support

Arrange FRAs for one managed building or a property portfolio

Send the essential management and first-property details. We can ask about the portfolio schedule, responsibilities, access, documents and deadlines when we call.

  • No obligation to book
  • Telephone number required
  • Property schedules and detailed records can be discussed securely after the initial enquiry

How to check a fire risk assessor’s competence

Submitting this form does not confirm an appointment, compliance outcome or fixed price.

Sources and limitations

Guidance reviewed 6 August 2026

This page provides general information for England. It is not legal advice or a building-specific assessment. Fire Safety Services is independent and is not affiliated with the Government, enforcing authorities, BAFE, NFRAR or IFSM.