Monthly tests, annual duration tests and records

Emergency lighting testing in London and Surrey

Plan suitable emergency-lighting tests, manage battery recharge and faults, and request a testing quote for your premises.

Reviewed: 9 September 2026Coverage: London and SurreyGuidance: England

Service overview

What emergency lighting testing involves

Emergency-lighting testing checks whether luminaires and signs operate when the normal supply fails. A short monthly functional test and an annual full-rated-duration test answer different questions and both require reliable records.

Full-duration testing needs careful timing because batteries are depleted by the test. The responsible person should consider daylight, occupancy, recharge time, temporary precautions and how quickly failed fittings will be repaired.

Start with the fire risk assessment. It should identify the precautions needed for the actual premises and explain how this service fits the emergency plan and wider fire-safety arrangements. Read the fire risk assessment guide.

Scope of work

Services you may need

A quotation should state exactly which parts of the work are included and who is responsible for design decisions, access, certification and any remedial work.

01

Asset identification

Create or confirm a schedule of luminaires, signs, locations, types and test arrangements.

02

Monthly functional test

Simulate supply failure briefly and record whether every unit operates.

03

Annual duration test

Run units for their rated duration and record failures, deterioration and recharge arrangements.

04

Central-system checks

Review central batteries, controls, monitoring and distribution where fitted.

05

Fault reporting

Identify failed lamps, batteries, indicators, test keys, circuits and coverage concerns.

06

Remedial retest

Confirm repaired or replaced units perform where retesting is within the scope.

Building-specific requirements

What should the test programme distinguish?

The examples below are a guide, not a specification. The appropriate solution must follow the premises risk, use, relevant standards and any existing fire strategy.

Functional operation

A short test confirms changeover and immediate illumination without exhausting the battery.

Rated duration

The annual test checks whether the system remains operational for its designed duration.

Coverage concerns

A working fitting may still be obscured, damaged or unsuitable after layout changes.

Recharge and temporary risk

Plan how occupants remain safe after batteries have been discharged.

Law and recognised guidance

Requirements and standards

British Standards are codes of practice rather than legislation in themselves. They can nevertheless provide recognised evidence of good practice and may be referenced by fire strategies, contracts, insurers and enforcing authorities. Read: Emergency lighting regulations and testing.

Fire Safety Order 2005

Requires emergency lighting where necessary and maintenance of fire-safety measures.

BS 5266-1:2025

Current code of practice for emergency lighting of premises.

BS EN 50172

Addresses emergency escape-lighting systems, including inspection, testing and records.

System design and manufacturer information

Define rated duration, test method, recharge and component-specific requirements.

Testing and maintenance

Monthly and annual emergency-lighting tests

Use a documented regime that suits the system and premises, and respond promptly when a test reveals reduced protection.

  1. 1

    Routine observation

    Check indicators and look for damaged, obscured or visibly defective equipment.

  2. 2

    Monthly functional test

    Simulate a short failure and confirm every emergency luminaire and internally illuminated sign operates.

  3. 3

    Annual full-duration test

    Test for the rated duration and inspect the result while managing recharge and occupancy.

  4. 4

    After alterations or repair

    Review coverage and retest affected equipment after changes or remedial work.

Common findings

Problems that should not be ignored

A failed test, damaged component or undocumented change should be assessed and dealt with according to its effect on life safety—not simply left until the next scheduled visit.

Short battery duration

A unit may start correctly but fade before the required period has elapsed.

Failed changeover

A fitting can work on mains power yet fail when the normal supply is removed.

Obscured or missing coverage

New partitions, displays or routes can leave important points dark.

Incomplete records

Missing asset references and results make repeat faults difficult to manage.

From enquiry to records

How arranging the work normally proceeds

  1. 1

    Describe the premises

    Share the postcode, building use, size, current provision and the work or problem you need addressed.

  2. 2

    Clarify the scope

    A provider may ask for documents, photographs, asset numbers, access details or a preliminary survey.

  3. 3

    Review the quotation

    Check what is included, exclusions, standards, certification, timescale, remedial rates and reporting.

  4. 4

    Arrange the visit

    Coordinate access, occupants, isolations and any temporary precautions needed while work is underway.

  5. 5

    Keep the records

    Retain reports, certificates, asset schedules, test results and evidence that identified defects were resolved.

Planning a quotation

What affects emergency lighting testing costs?

Useful quotations are based on the actual scope and condition, not a single headline price.

See monthly and annual testing price ranges

01

Number of fittings

Asset count, types, buildings and floors.

02

Test duration

Monthly functional work or annual full-duration testing and revisit needs.

03

Access

Ceiling height, secure areas, out-of-hours work and test-key availability.

04

System condition

Failures, obsolete fittings, missing schedules and unclear circuits.

Choosing a provider

Check competence for the exact work

Ask who will survey, design, install, commission, inspect or maintain the provision and what evidence supports their competence for that role. Check relevant experience, insurance, third-party certification where applicable, reporting, exclusions and how defects will be prioritised.

BAFE SP203-4

BAFE SP203-4 includes certification for emergency-lighting maintenance. Confirm the provider holds the module relevant to the required work.

Check the relevant BAFE scheme

Related precautions

Fire safety works as a system

Changes to one measure can affect detection, escape, compartmentation, lighting, signs, equipment and the emergency plan. Keep the fire risk assessment and records aligned.

Frequently asked questions

Emergency lighting testing FAQs

How often should emergency lighting be tested?

A common standards-based programme uses a monthly functional test and an annual full-rated-duration test, supported by routine visual checks and records.

What is the difference between monthly and annual testing?

The monthly test briefly confirms immediate operation. The annual test checks whether the system can sustain its rated duration.

Can the annual test be carried out during business hours?

It may be possible, but the test depletes batteries. Timing, occupancy, daylight, temporary precautions and recharge time must be planned.

Does a green charging light prove the fitting will pass?

No. It may indicate a supply or charging state but does not prove correct changeover, illumination or rated battery duration.

What should the test report include?

It should identify the premises and equipment tested, method, date, results, failures, limitations, remedial priorities and any retest needed.

Service-specific enquiry

Request a quote for emergency lighting testing

Tell us about the premises and the work required. Your enquiry can be reviewed and passed to a suitable provider serving London or Surrey.

  • No obligation to proceed
  • Telephone number required for useful follow-up
  • Use the details box for faults, deadlines or access constraints

Submitting this form does not confirm an appointment, compliance outcome or fixed price.