Performance classification guide

Fire door ratings explained

A rating is a statement about performance under a defined test or assessment—not a guarantee that every installed door will achieve that time in a real fire.

Reviewed: 26 August 2026Guidance: EnglandInspection enquiries: London and Surrey

Direct answer

What do FD30 and FD60 mean?

In common UK usage, FD30 and FD60 describe timber-based door assemblies intended to provide at least 30 or 60 minutes of fire-resistance integrity under the relevant evidence. Higher periods can be specified where the design requires them.

Rating language

What do FD30 and FD60 mean?

In common UK usage, FD30 and FD60 describe timber-based door assemblies intended to provide at least 30 or 60 minutes of fire-resistance integrity under the relevant evidence. Higher periods can be specified where the design requires them.

The rating applies to the represented doorset configuration. It should not be inferred from thickness, colour, weight or a label alone.

Common descriptionBroad meaningDo not assume
FD30Nominal 30-minute integrity classificationThat smoke leakage is also controlled
FD30SFD30 with the required smoke-control performanceThat any brush seal or threshold gap is acceptable
FD60 / FD60SNominal 60-minute integrity, with S adding smoke controlThat FD30 components can simply be reused
E / EI classificationsEuropean integrity and, where stated, insulation classificationDirect equivalence without checking the specification

Design decision

Who decides the required rating?

Approved design information, the fire strategy, compartmentation plans and applicable guidance establish the intended performance. A fire risk assessment may identify missing evidence or an unsuitable condition, but should not invent a rating without understanding the building.

When a replacement is proposed, confirm the wall, opening, door use, dimensions, glazing, hardware, smoke requirement and certification route. A more highly rated leaf is not automatically a safe substitute if the rest of the arrangement is incompatible.

  • Locate the door on the compartment or fire-strategy drawings
  • Confirm integrity and smoke-control objectives
  • Check supporting wall and permitted configuration
  • Specify the complete doorset and hardware
  • Retain installation, inspection and maintenance evidence

Correct interpretation

Why the minute rating is not a real-fire stopwatch

Standard testing enables products and systems to be compared under controlled exposure. Real fires vary in fuel, ventilation, pressure, geometry, damage and firefighting intervention. The result therefore supports design; it does not promise an exact safe waiting time.

A door that is wedged open, does not latch, has incompatible glazing or is badly installed may not provide the expected barrier regardless of the stated rating.

Apply the guidance

Move from a reference question to a doorset decision

Identify the door’s role and evidence, record its actual condition, then choose the level of inspection or remedial support the building requires.

01Use the free checklist02Inspection scope guide03Estimate inspection cost04Find an inspector

Frequently asked questions

Fire door ratings explained FAQs

These answers provide general guidance for England. The correct conclusion depends on the door, building, design evidence and people at risk.

What is the difference between FD30 and FD30S?

FD30 refers to a nominal 30-minute integrity classification. The S denotes an additional smoke-control requirement for the doorset.

Is FD60 always better than FD30?

FD60 offers a higher stated test period, but the correct door is the compatible system specified for that location. An incorrectly installed FD60 assembly is not a better solution.

Can I identify a rating by measuring door thickness?

No. Thickness alone cannot establish the doorset rating. Use reliable product, project or certification evidence and competent investigation.

Professional support

Find a fire door inspector in London or Surrey

Describe the premises, approximate number of doors and the concern or deadline. A relevant provider can review the likely inspection scope and contact you about a quotation.

  • No obligation to proceed
  • Telephone number required for useful follow-up
  • Your enquiry may be shared with a relevant provider

Submitting this form does not confirm an appointment, fixed price or compliance outcome.

Sources and limitations

Guidance reviewed 26 August 2026

This page is general information for England. It is not legal advice, a fire-risk assessment, product specification, certification decision or inspection of an installed doorset. Standards can be amended; confirm the edition and transition applicable to the work.